Part I | Introduction to Final EIR |
Part II | Mitigation Monitoring and Reporting Program |
Part III | Comments Received on the Draft EIR and Responses |
Part IV | Revised Draft EIR |
Chapter 1 | Summary |
Chapter 2 | Introduction |
Chapter 3 | Environmental Setting |
Chapter 4 | Project Description |
Chapter 5 | Existing Conditions, Impacts, and Mitigation |
| 5.1 Aesthetics |
| 5.2 Air Quality |
| 5.3 Biological Resources |
| 5.4 Cultural Resources |
| 5.5 Geology and Soils |
| 5.6 Greenhouse Gas Emissions |
| 5.7 Hazards and Hazardous Materials |
| 5.8 Hydrology and Water Quality |
| 5.9 Noise |
| 5.10 Transportation and Traffic |
Chapter 6 | Cumulative Impacts |
Chapter 7 | Other CEQA Considerations |
Chapter 8 | Alternatives |
Chapter 9 | References |
Chapter 10 | EIR Preparers |
| |
Appendix A | Notice of Preparation and Comments on the NOP |
Appendix B | Air Quality Analysis |
Appendix C | Biological Resources Letter Report |
Appendix D | Cultural Resources Survey |
Appendix E | Historic Resources Evaluation Report |
Appendix F | Preliminary Geotechnical Investigation |
Appendix G | Greenhouse Gas Emissions Analysis |
Appendix H | Noise Technical Report |
Appendix I | Traffic Impact Analysis |